Intechatandart

Production equipment

Machine selection for the task, process routing, cutting tools, special tooling and gauges. Turnkey production line launch.

Send a drawing
01
Turnkey
launch
02
Route + process
full package
03
6–12 mo.
launch cycle
Roadmap

Launching a production line

A typical cycle from the requirements specification to series production is 10–12 months. Machine selection and tooling manufacture run in parallel with the makers' lead times.

PROJECT · ROADMAPEQUIPMENT / 01
01 / Scope

What the service includes

01 / 04

Machine selection

For the process task and the series.

02 / 04

Process routing

Route cards and parameters for the selected machinery.

03 / 04

Cutting tools

Tool selection and procurement.

04 / 04

Special tooling and gauges

Manufacturing and supply.

03 / Materials

Materials and tolerance by size

Task type
Machinery
Series / year
Launch time
Serial machining
5-axis CNC + CMM inspection
5,000 – 100,000 pcs
6–9 mo.
Stamping
Press + die set
20,000 – 500,000 pcs
6–12 mo.
Plastic moulding
IMM + moulds + dryers
10,000 – 1,000,000 pcs
6–12 mo.
Non-ferrous die casting
Die casting machines + moulds + melting
5,000 – 100,000 pcs
9–14 mo.
Assembly and test
Process line + test rigs
From 1,000 pcs
4–8 mo.
04 / Our machinery

The equipment we work on

Our own production facility's machinery — used to make special tooling, gauges and precision parts for customers' lines.

5-axis machining centre — Mazak VARIAXIS i-700
5-axis machining centre01 / 05
5-axis machining centre

Mazak VARIAXIS i-700

Complex geometries and undercuts in a single setup — no refixturing.

Work envelope
700 × 700 × 500 mm
Spindle
up to 12,000 rpm
Repeatability
±0.003 mm
Tool magazine
30 tools
Wire EDM — Sodick AQ535L
Wire EDM02 / 05
Wire EDM

Sodick AQ535L

Contour cutting of complex profiles and internal contours with IT7 tolerance.

Work envelope
500 × 350 × 250 mm
Thickness
up to 250 mm
Wire
⌀ 0.1–0.3 mm
Accuracy
±0.003 mm
Swiss-type lathe — Tsugami B0206-V
Swiss-type lathe03 / 05
Swiss-type lathe

Tsugami B0206-V

Serial turning of small precision parts from bar stock — the full cycle in one setup.

Bar ⌀
up to 20 mm
Spindles
10,000 / 12,000 rpm
Tools
27 stations
Control
FANUC 0i-TF Plus
Surface grinder — Okamoto ACC-1224ST
Surface grinder04 / 05
Surface grinder

Okamoto ACC-1224ST

Plates, bases and guides — after heat treatment.

Work table
600 × 300 mm
Accuracy
±0.002 mm
Surface finish
Ra 0.2 µm
Magnetic table
Polishing station — Manual + diamond paste
Polishing station05 / 05
Polishing station

Manual + diamond paste

Surface finishing to a mirror finish and sealing joints.

Surface finish
Ra down to 0.02 µm
Inspection
SJ-410 profilometer
For steels
S136, 2316, 718H
Application
Optical, medical plastics
NB

Equipment class; the exact lineup and serial numbers — on request under NDA.

06 / Spec checklist

8 points before sending a line selection spec

What the spec must contain for a fast and accurate calculation and equipment selection. Missing data means clarifications and longer lead times.

Rule 01 / 08

Product range and drawings

Drawings + 3D models + 1 reference sample

Better with 3–5 typical positions than the whole catalogue.

Rule 02 / 08

Annual production program

Pcs/year + seasonality · work schedule (1 / 2 / 3 shifts)

Defines the required output rate and machinery makeup.

Rule 03 / 08

Quality requirements

IT grades, Ra, inspection procedures, AQL

Affects the equipment class and CMM configuration.

Rule 04 / 08

Floor space and infrastructure

Line footprint + utilities (electricity, coolant, air)

Equipment dimensions are limited by the site.

Rule 05 / 08

Budget (CAPEX + OPEX)

Capital costs + OPEX/year estimate

Affects the choice of brand and specification.

Rule 06 / 08

Launch deadline

Target date for reaching serial output

We choose the class with delivery lead times in mind.

Rule 07 / 08

Regulations and certification

Product / line certification requirements

Determines the documentation and acceptance.

Rule 08 / 08

Infrastructure readiness

Staff, IT systems, warehouse, logistics

We match the interface complexity to the customer's readiness level.

07 / Spec documentation

What to send for a line calculation

The more detail up front — the more accurate the calculation. If some data is missing — we fill in the questionnaire together.

Minimum drawing content
DRAWING / EXAMPLE
  • 01Drawings of all products in the range
  • 02Annual production program
  • 03Quality requirements (Ra, IT, AQL)
  • 04Line footprint + layout
  • 05Electrical supply (kVA, phases)
  • 06Compressed air (bar, m³/min)
  • 07Work schedule (shifts, days)
  • 08Operator and engineering team composition
3D formats
06
  • ·STEP / STP (products)
  • ·IGES / IGS
  • ·X_T (Parasolid)
  • ·SLDPRT / PRT
  • ·Reference samples (physical)
  • ·Existing route cards
2D drawings
04
  • ·DWG / DXF of product drawings
  • ·PDF of drawings and specifications
  • ·Site plan (DWG) with utilities
  • ·Questionnaire (per our form)
08 / Launch and acceptance

Launch stages and support

Launching the line at the customer's site is a separate stage. We do it ourselves or together with the customer's engineers. Maintenance schedule and operator training — always included.

Stage
What we do
Where
Duration
Equipment installation
Installation, alignment, hook-up
Customer site
1–3 wk
Commissioning
Function checks, calibration
Customer site
1–2 wk
Test batch trials
Route launch, reaching target parameters
Customer site
2–4 wk
Acceptance per PMI
Test program, reports
Customer site
1 wk
Operator training
Per the work regulations
Customer site
1–2 wk
Handover to operation
Launch acceptance report, maintenance schedule
Customer site
Warranty support
Remote + scheduled visits
Remote
12 mo.
Service and fine-tuning
On request after the warranty
Per contract
On request
10 / Documentation

What we deliver

Handed over to the customer with the line launch — the full package from specification to maintenance schedule.

Machinery specificationProcess routing (route cards)Process parameter cardsGauge setAcceptance test program (PMI)Launch acceptance reportMaintenance scheduleOperator training program
11 / FAQ

Frequently asked questions

01What budget is needed to launch a line?

Depends on the machinery and the series. Typical machining for 50,000 pcs/year — from RUB 30 million for equipment plus RUB 5–8 million for routing and tooling. We prepare a calculation for your specification within 1–2 weeks.

02What data is needed for the calculation?

Product drawings, annual production program, quality requirements, floor space for the line, utilities (electricity, compressed air), work schedule. The checklist is in the 'Before sending the spec' block.

03Do you supply equipment or select it?

We select it for the task and negotiate with manufacturers / dealers directly on the customer's behalf. Special tooling, gauges and the route — we make in-house.

04Who is responsible for launch and acceptance?

Our engineering team — at the customer's site. The acceptance program (PMI) is agreed in advance. The result is a launch acceptance report and a maintenance schedule.

05Is operator training included?

Yes, the training program for operators and shift engineers is part of the scope. Handed over together with the operating regulations.

Inquiry

Send a drawing —
we'll quote within 24 hours

Fill in the form or contact us directly — any channel works.

ПН–ПТ · 09:00–18:00 · МСК